North Rift Valley Water Works Development Agency

The following are the major ongoing projects being implemented by Central Rift Valley Water Works Development Agency under the AfDB funded Kenya Towns Sustainable Water Supply and Sanitation Program(KTSWSSP).

25,000m3/day at a cost of KES.1.1 Billion- at 20% progress

Extension of sewerlines approx. 35km long- Cost 500 Million- Due for Mobilization

Capacity of  3,000m3/dayat a cost of KES 345 Million- Due for Mobilization

Capacity of 1,000m3/day-at a cost of KES 284 Million-  Due for Mobilization

The scope involves feasibility studies, preliminary and detailed designs and preparation of tender documents for the expansion of the existing Two Rivers Dam and Sosiani Treatment works to a capacity 0f about 72,000m3/day from the current 14,000m3/day. The preliminary designs have been prepared and shared with stakeholders. The project is estimated to cost KES 14 Billion and will be the game changer for Eldoret town and adjacent centres upon completion.

  • Construction of new 22m high dam with a storage capacity ot 7.7MCM
  • Construction of Aprox. 166kms of pipelines
  • Construction of 12No. storage tanks
  • Construction of a Conventional Water Treatment Plant of capacity 18,000m3/day to supply Iten Town and the neighbouring areas
  • Capacity Building of the WSP
  • Spring Development and protection, installation of pumping system complete with 9.7 KM distrbution lines.
  • Construction of 1 no. 100 CM masonry tank and rrehabilitation of existing tank
  • Construction of new intake Weir,
  • Construction of Gravity Main 9Km length.
  • Construction of 4 NO. Storage Tanks and 22km Distribution network.
  1. Construction of a 600m3 Composite Filtration Unit (CFU) at Kapchesewes treatment works.
  2. Construction of 225m3 clear water tanks.
  3. Rehabilitation of 4 No. Masonry Tanks i.e.
    a. Kapchesewes Masonry tank 100m3
    b. Ngorngoroi Masonry Tank 50m3
    c. Kiplabai Masonry Tank 50m3
    d. Rorok Masonry Tank 50m3
    e. Kapchelos Masonry Tank 50m3
  4. Rehabilitation of existing Cheles Composite Filtration Unit (CFU)
  5. Replacement and installation of new HDPE pipelines with a cumulative length of 19 km, consisting of assorted sizes and pressure ratings (PN).
  6. Other civil work includes sanitation blocks, master meters, operators house etc.

Rehabilitation of Treatment Works, Solarization of Treatment and Pumping system, Pipe laying, Construction of Tank and Rehabilitation of Tanks, Rehabilitation of staff houses and offices, Construction of water.

  • Rehabilitation of existing 3 no. little dams
  • Construction of water treatment plant
  • Laying of pipelines
  • Construction of ablution blocks and water kiosks
  • Construction of the Concrete Intake at Chepkaitit River
  • Construction of 550 Meters DN450 Raw Water Mains
  • Construction of Conventional Water Treatment Plant Works of capacity 14,000m3/day
  • Construction of 4 No. Storage tanks (1,500m3 at Milimani, 500m3 at Kachibora, 1,500m3 at Maji Mazuri and 100m3 at Kiptoi)
  • Construction of 11No. water kiosks
  • Constrution of 132kms of pipeline of various sizes

Construction of intake weir, Raw Water gravity main length 500m, construction of CFU, Partial desilting of Dam, Rising main, 100m3 elevated storage tanks, distribution mains and water kiosk.

  • Drilling and Development: A new borehole is the primary water source.
  • Solar-Powered Pumping System: Sustainable energy for pumping.
  • Water Storage: Installation of an elevated steel water tank.
  • Distribution: A distribution pipeline to supply water, including a community water kiosk.
  • Construction of Intake Weir on Embobut River
  • Raw water Gravity Main OD 250 HDPE (PN 10 to PN20) Length 13.8km
  • Transmission lines OD 110/100 HDPE/Steel – 15km
  • Construction of chambers, installation of air valves and washouts
  • Installation of marker posts
  • Construction of 2 No. Administration Buildings
  • Construction of 12no. sanitation facilities
Ongoing Projects
Kipkarren dam Treatment works and associated pipelines
Last Mile Connectivity Works for Eldoret town
Kapenguria Sewerage project
Chepareria Sewerage Project
Two Rivers Dam and Sosiani Treatment Works Expansion